Submittal and approval of a Water Management and Sediment Control Plan is required when one of the following conditions exist
- Earth disturbance of over one acre; or
- Construction on a lot within a subdivision; or
- Construction of over 300 square feet within the townships of Auburn, Bainbridge, Chester, Newbury, Munson, Russell, and Thompson
Please refer to www.geaugaswcd.com and go to the Construction Sites tab and download the Geauga County Water Management and Sediment Control Regulations, Amended 2009 for a complete list of plan requirements and calculations.
Location: 14269 Claridon-Troy Road. Burton, Ohio 44021
Phone: (440) 834-1122
Fax: (440) 834-0316